How long should you wait for a contractor?
The numbers for a set time and for a window, what to send at each point, and when to stop waiting and go about your day.
Twenty minutes past the time. Nothing yet. You are trying to work out whether you are being impatient or being stood up, and the honest answer is that it depends on what you were promised.
If you were given a set time: fifteen minutes
Five or ten minutes is traffic. At fifteen minutes past a set time with no message, send a text. Not because fifteen minutes is late, but because a contractor who is going to be an hour knows it by now, and a short question gets you that information instead of another forty minutes at the window.
If you were given a window: the end of it, plus an hour
A window of eight to twelve means someone is genuinely first and someone is genuinely last. Do not build the morning around eight. Send one message at the start of the window asking roughly where you fall, then leave it alone until the window closes. An hour past the end of the window with no contact at all is the point where the day is lost, and you can say so.
What to send, and when
Ask a question that can be answered with a number. "Where are you?" gets "on my way", which tells you nothing. "What time?" gets a time.
Hi, this is Sam at 14 Elm Street. Just checking on today's appointment. What time do you think you'll get here?
Morning, just checking roughly where I fall in your day so I can plan around it. No rush.
Hi, I haven't heard anything and it's now past the window. Are you still coming today, and if so roughly when? If not, can we book a firm time this week?
When to stop waiting
If your last message has had no reply for an hour, treat the day as finished. Say so in one line, ask for a firm slot this week, and go and do the thing you cancelled. A vague "later today" tends to eat the evening as well, so do not accept one. What you do next depends on whether they come back with an apology and a time, or with silence. The no-show guide covers that.
How to not be here next time
Three things, all asked when you book. Take the first slot of the day, because nothing can run over before you. Ask whether they will text you when they set off, with a time. And prefer the contractor who offers a live arrival time, one that updates as their day changes, because that is the whole question answered before you have to ask it.
Common questions
Is thirty minutes late normal for a contractor?+
It is common, and on its own it is not a red flag. Thirty minutes with no message is the part worth noticing. Good contractors tell you before you have to ask.
Should I call or text a late contractor?+
Text. It can be answered from under a sink with one hand, and it leaves a record of what was said. Call only if the text has gone unanswered for a while.
Do I have to wait through the whole arrival window?+
You agreed to it, so yes, in fairness. But you did not agree to wait past it, and an hour past the end with no word is the point to ask directly whether they are still coming.
Read next